CAMPUS SECURITY SYSTEMS INSTALLATION AND UPGRADES

Architect: MDC Engineering Inc

Low Bid Pre-Qualified Contractor: Nexus IS Inc.

Program / Construction Manager: SMC / LPI, Inc

Status: Under Construction.


This project involves the replacement of the existing Physical Security Systems and expanding those systems to both existing and newly constructed facilities. There are 35 buildings in the scope across three (3) of the college’s campuses. The project includes (but is not limited to) CCTV, door access controls, electronic database import migration and new Police Dispatch workstations.